ADDITIONAL CASE STUDIES

Southwark Town Hall

We have been awarded the project by Alumno Developments at the existing Southwark Town Hall and Theatre Peckham. This involves the conversion of the existing town hall to Student Accommodation, Artist Studios and a Café.

READ PDF
Egham Phase 1

This project comprises the design construction and completion of a five storey structure containing 100 No. student studio rooms together with the associated external works.

READ PDF
Egham Phase 2

The Phase II construction will be a mix of an insitu concrete and structural timber cassette frame on a raft foundation with brickwork and rendered elevations. The rooms being fitted with en-suite pods manufactured off site by our associated Company.

READ PDF
King Solomon High School, Ilford

The design and construction of a new extension to King Solomon High School, including alterations to 4 existing classrooms, corridors and reception area including the construction of a 698m2 Arts & Music space on 2 storeys.

READ PDF
Ilford Jewish Primary School, Ilford

This project is to construct a new 1½ form entry Primary School on a site originally forming part of the adjacent Senior School.

READ PDF
Mile End Road

The development at Mile End Road consists of the design and construction of 600 student rooms together with associated teaching facilities.

READ PDF
The Arcade, Holloway Road

The existing 7 storey building on Holloway Road is to be refurbished through the summer holidays to provide 370 refitted bedrooms, 70 new kitchens and 140 new toilet and shower areas all in a cluster format.

READ PDF
Pitfield Street

This project comprised the design, construction and completion of an eight-storey block of 512 student rooms, together with associated external works and drainage.

READ PDF
Tufnell Park

This project was for the design and construction of 707 student accommodation units comprising the new construction of 552 units, using a precast concrete frame and installing steel ‘pod’ en-suites to every room.

READ PDF
Parsifal College

An interesting and prestigious project for Le Chambre de Commerce et d’Industrie de Paris involved the refurbishment and extension of the existing college building.

READ PDF
Effra

This project comprised the construction of a newbuild nursery school within the playground and site area of the existing school whilst the existing school remained in occupation.

READ PDF
Yesodey Hatorah

The building comprises approximately 4400m2 of floor space for up to 450 pupils and is a combination of traditional and modern construction.

READ PDF
Yesodey Hattorah Ancillary Works

This project involved the design and construction of a new 2-storey annexe building comprising storage rooms at ground floor with a gymnasium at first floor.

READ PDF
Ashridge

The construction of a high-tech teaching facility within the grounds of an existing Grade 1 listed property, was the initial requirement from Ashridge Management College in the extension and development of their facilities.

READ PDF

ACCREDITATIONS AND MEMBERSHIPS

  • investors in people
  • Contructionline part of capital plc
  • safe contractor approved
  • British Safety Council approved
  • CHAS member
  • UKAS ISO9001 registered
  • UKAS ISO9001 registered
  • UKAS ISO9001 registered