UCL
The work at this busy London University involved the internal conversion and refurbishment of the upper and lower basements and first floor office areas.
The brief
Work was carried out to the ground floor, two levels of basement and a light well in an existing occupied block in central
What we did
The existing building, altered whilst the remainder was in occupation, is a concrete clad steel frame with concrete floors (part of which had to be replaced). The refurbishment included a combination of laboratories, office fitting out and all mechanical and electrical services.
The result
The works were in two phases, all works were programmed and executed to co-ordinate with the staff and students so they could continued to use the building through the contract.